DIRECAO-GERAL DE ENERGIA E GEOLOGIA

logo

  Av 5 De Outubro 208 – Lisboa – 1069-203

  VAT: PT600076610


Complicit EU Projects


  Within the Horizon 2020 (2014-2020) framework, DIRECAO-GERAL DE ENERGIA E GEOLOGIA has received € 109,066.0 for its participation in a total of 1 project(s) with a total cost of € 13,827,426.
Start
YYYYMMDD
End
YYYYMMDD
Project ID Project Name Themes Role EC Contribution Total Cost IL Participation Total Participation CORDIS Link
2019-06-01 2024-05-31 838311 CSP ERANET electric power generation  ·  concentrated solar power participant € 109,066.32 € 13,827,426 1 13 CORDIS ↪

  Within the Horizon Europe (2021-2027) framework, DIRECAO-GERAL DE ENERGIA E GEOLOGIA has received € 94,653.0 for its participation in a total of 1 project(s) with a total cost of € 561,150,162.
Start
YYYYMMDD
End
YYYYMMDD
Project ID Project Name Themes Role EC Contribution Total Cost IL Participation Total Participation CORDIS Link
2022-05-01 2030-12-31 101069750 CETP ecosystems participant € 94,653.7 € 561,150,162 1 70 CORDIS ↪

 DIRECAO-GERAL DE ENERGIA E GEOLOGIA did not participate in complicit projects under FP7 (2007-2013).