ALMADESIGN CONCEITO E DESENVOLVIMENTO DE DESIGN LDA

Rua Armando Cortes Ed Interface – Paço De Arcos – 2770 233
VAT: PT503847992
Complicit EU Projects
Within the Horizon 2020 (2014-2020) framework, ALMADESIGN CONCEITO E DESENVOLVIMENTO DE DESIGN LDA has received € 0.0 for its participation in a total of 2 project(s) with a total cost of € 319,961,143.
Start YYYYMMDD |
End YYYYMMDD |
Project ID | Project Name | Themes | Role | EC Contribution | Total Cost | IL Participation | Total Participation | CORDIS Link |
---|---|---|---|---|---|---|---|---|---|---|
2020-01-01 | 2023-12-31 | 945521 | GAM-2020-AIR | aircraft · aeronautical engineering | thirdParty | € 0.0 | € 109,777,562 | 2 | 92 | CORDIS ↪ |
2014-01-02 | 2019-12-31 | 807083 | GAM AIR 2018 | recycling · control systems · composites · rotorcraft · aeronautical engineering | thirdParty | € 0.0 | € 210,183,580 | 2 | 93 | CORDIS ↪ |
Within the Horizon Europe (2021-2027) framework, ALMADESIGN CONCEITO E DESENVOLVIMENTO DE DESIGN LDA has received € 97,956.0 for its participation in a total of 1 project(s) with a total cost of € 44,441,578.
Start YYYYMMDD |
End YYYYMMDD |
Project ID | Project Name | Themes | Role | EC Contribution | Total Cost | IL Participation | Total Participation | CORDIS Link |
---|---|---|---|---|---|---|---|---|---|---|
2023-01-01 | 2026-12-31 | 101102007 | HERA | energy and fuels | participant | € 97,956.25 | € 44,441,578 | 1 | 52 | CORDIS ↪ |
ALMADESIGN CONCEITO E DESENVOLVIMENTO DE DESIGN LDA did not participate in complicit projects under FP7 (2007-2013).