OFFSHORE RENEWABLE ENERGY CATAPULT

logo

  Offshore House Albert Street – Blyth Northumberland – NE24 1LZ

  VAT: GB888954046

   www.narec.co.uk


Complicit EU Projects


  Within the Horizon 2020 (2014-2020) framework, OFFSHORE RENEWABLE ENERGY CATAPULT has received € 0.0 for its participation in a total of 1 project(s) with a total cost of € 3,932,721.
Start
YYYYMMDD
End
YYYYMMDD
Project ID Project Name Themes Role EC Contribution Total Cost IL Participation Total Participation CORDIS Link
2017-10-01 2022-03-31 765579 ConFlex aircraft  ·  fluid dynamics  ·  wind power  ·  mathematics  ·  naval engineering partner € nan € 3,932,721 2 25 CORDIS ↪

  Within the Horizon Europe (2021-2027) framework, OFFSHORE RENEWABLE ENERGY CATAPULT has received € 0.0 for its participation in a total of 1 project(s) with a total cost of € 0.
Start
YYYYMMDD
End
YYYYMMDD
Project ID Project Name Themes Role EC Contribution Total Cost IL Participation Total Participation CORDIS Link
2023-02-01 2027-01-31 101073558 ModConFlex aircraft associatedPartner € nan € 0 1 17 CORDIS ↪

  Within the FP7 (2007-2013) framework, OFFSHORE RENEWABLE ENERGY CATAPULT has received € 388,628.0 for its participation in a total of 1 project(s) with a total cost of € 3,915,227.
Start
YYYYMMDD
End
YYYYMMDD
Project ID Project Name Themes Role EC Contribution Total Cost IL Participation Total Participation CORDIS Link
2009-01-01 2011-12-31 226267 ASPIS coating and films  ·  metalloids  ·  photovoltaic participant € 388,628.0 € 3,915,227 1 8 CORDIS ↪