IKERLAN S. COOP
P Jose Maria Arizmendiarrieta 2 – Mondragon – 20500
VAT: ESF20079828
http://www.ikerlan.es
Complicit EU Projects
Within the Horizon 2020 (2014-2020) framework, IKERLAN S. COOP has received € 1,074,512.0 for its participation in a total of 2 project(s) with a total cost of € 61,210,015.
Start (YYYYMMDD) | Project ID | Project Name | Themes | End (YYYYMMDD) | Role | EC Contribution | Total Cost | IL Participation | Total Participation | CORDIS Link |
---|---|---|---|---|---|---|---|---|---|---|
2018-11-01 | 783158 | REACTION | renewable energy · inorganic compounds · electrolysis · semiconductivity · metalloids | 2023-04-30 | participant | € 304,500.0 | € 49,767,672 | 1 | 36 | CORDIS ↪ |
2021-01-01 | 958205 | i4Q | software · subtractive manufacturing · microtechnology · forestry | 2023-12-31 | participant | € 770,012.5 | € 11,442,342 | 1 | 26 | CORDIS ↪ |
Within the Horizon Europe (2021-2027) framework, IKERLAN S. COOP has received € 1,910,193.0 for its participation in a total of 3 project(s) with a total cost of € 44,128,421.
Start (YYYYMMDD) | Project ID | Project Name | Themes | End (YYYYMMDD) | Role | EC Contribution | Total Cost | IL Participation | Total Participation | CORDIS Link |
---|---|---|---|---|---|---|---|---|---|---|
2023-01-01 | 101093110 | EXTRACT | smart cities · 5G · internet of things · data mining · sensors | 2025-12-31 | participant | € 489,125.0 | € 4,997,875 | 1 | 12 | CORDIS ↪ |
2022-09-01 | 101057404 | ZDZW | eHealth · manufacturing engineering · food technology · renewable energy · coating and films | 2025-08-31 | coordinator | € 1,070,493.75 | € 11,183,587 | 1 | 30 | CORDIS ↪ |
2023-01-01 | 101102010 | HERWINGT | fibers · control systems · composites · aircraft · energy and fuels | 2025-12-31 | participant | € 350,575.0 | € 27,946,959 | 1 | 33 | CORDIS ↪ |
IKERLAN S. COOP did not participate in FP7 (2007-2013).