INNOLUME GMBH

logo

  Konrad Adenauer Allee 11 – Dortmund – 44263

  VAT: DE225038980


Complicit EU Projects


  Within the Horizon 2020 (2014-2020) framework, INNOLUME GMBH has received € 355,162.0 for its participation in a total of 1 project(s) with a total cost of € 6,624,737.
Start
YYYYMMDD
End
YYYYMMDD
Project ID Project Name Themes Role EC Contribution Total Cost IL Participation Total Participation CORDIS Link
2019-01-01 2023-12-31 825453 Caladan manufacturing engineering  ·  fibers  ·  optoelectronics  ·  semiconductivity  ·  metalloids  ·  fibre optics  ·  laser physics participant € 355,162.5 € 6,624,737 1 10 CORDIS ↪

  Within the Horizon Europe (2021-2027) framework, INNOLUME GMBH has received € 536,952.0 for its participation in a total of 2 project(s) with a total cost of € 106,796,255.
Start
YYYYMMDD
End
YYYYMMDD
Project ID Project Name Themes Role EC Contribution Total Cost IL Participation Total Participation CORDIS Link
2022-09-01 2026-08-31 101070560 PUNCH 5G  ·  nanophotonics participant € 143,502.87 € 4,895,597 1 8 CORDIS ↪
2023-01-01 2025-12-31 101097296 HICONNECTS internet of things  ·  revolutions  ·  sensors  ·  metalloids participant € 393,450.0 € 101,900,657 12 67 CORDIS ↪

 INNOLUME GMBH did not participate in complicit projects under FP7 (2007-2013).