AIRBUS

2 Rond Point Emile Dewoitine – Blagnac – 31700
VAT: FR89383474814
http://www.airbus.com
Complicit EU Projects
Within the Horizon 2020 (2014-2020) framework, AIRBUS has received € 878,595.0 for its participation in a total of 2 project(s) with a total cost of € 319,961,143.
Start (YYYYMMDD) | Project ID | Project Name | Themes | End (YYYYMMDD) | Role | EC Contribution | Total Cost | IL Participation | Total Participation | CORDIS Link |
---|---|---|---|---|---|---|---|---|---|---|
2020-01-01 | 945521 | GAM-2020-AIR | aircraft · aeronautical engineering | 2023-12-31 | participant | € 57,237.25 | € 109,777,562 | 2 | 92 | CORDIS ↪ |
2014-01-02 | 807083 | GAM AIR 2018 | recycling · control systems · composites · rotorcraft · aeronautical engineering | 2019-12-31 | participant | € 821,358.2 | € 210,183,580 | 2 | 93 | CORDIS ↪ |
AIRBUS did not participate in complicit projects under Horizon Europe (2021-2027).
Within the FP7 (2007-2013) framework, AIRBUS has received € 135,533.0 for its participation in a total of 2 project(s) with a total cost of € 133,739,584.
Start (YYYYMMDD) | Project ID | Project Name | Themes | End (YYYYMMDD) | Role | EC Contribution | Total Cost | IL Participation | Total Participation | CORDIS Link |
---|---|---|---|---|---|---|---|---|---|---|
2009-05-01 | 234344 | CRESCENDO | product engineering · aircraft · aeronautical engineering | 2012-10-31 | participant | € 125,533.0 | € 54,792,972 | 1 | 59 | CORDIS ↪ |
2008-10-01 | 999906 | ED | aircraft | 2017-12-31 | participant | € 10,000.0 | € 78,946,612 | 1 | 41 | CORDIS ↪ |