ACEM RAIL (265954)

  https://cordis.europa.eu/project/id/265954

  FP7 (2007-2013)

  Automated and cost effective maintenance for railway

  Automated and cost effective railway infrastructure maintenance (SST.2010.5.2-1.)

  freight transport  ·  automation

  2010-12-01 Start Date (YY-MM-DD)

  2013-11-30 End Date (YY-MM-DD)

  € 3,849,273 Total Cost


  Description

ACEM-Rail project deals with automation and optimisation of railway infrastructure maintenance. It focuses on the track. The final goal is to reduce costs, time and resources required for maintenance activities and increase the availability of the infrastructure. The project includes both conventional and high speed lines. ACEM-Rail project will mean an important step forward in railway infrastructure maintenance techniques for the following reasons: • Several technologies for automated and cost effective inspection of the track (subgrade and superstructure) condition will be developed and prototypes will be manufactured. These technologies will be applicable both to conventional and high speed lines. • Predictive algorithms will be developed to estimate the rail defects evolution. • Algorithms will be developed for an optimal planning of railway infrastructure maintenance tasks. For the moment, there are not appropriate optimisation models for the integrated scheduling of preventive and corrective operations. • Modes and tools will be developed in order to monitor the proper execution of corrective and preventive maintenance tasks. These technologies will be applied in mobile (hand.held) computers. This way execution and monitoring of maintenance tasks will be automated and optimized. • A novel technology based on intelligent systems will be developed for the optimal management of all the subsystems in the whole railway infrastructure system. A classification of all the different subsystem together with the selection of most relevant parameters will be carried out. The main benefits of the project are: (i) reduction of cost, (ii) increase in safety, quality and reliability of the service, (iii) increase of rail freight transport and, as a consequence, (iv) reduction in CO2 emissions.


  Complicit Organisations

1 Israeli organisation participates in ACEM RAIL.

Country Organisation (ID) VAT Number Role Activity Type Total Cost EC Contribution Net EC Contribution
Spain CENTRO DE ESTUDIOS DE MATERIALES Y CONTROL DE OBRA SA (995821886) ESA29021334 coordinator PRC € 0 € 578,141 € 0
Germany FRAUNHOFER GESELLSCHAFT ZUR FORDERUNG DER ANGEWANDTEN FORSCHUNG EV (999984059) DE129515865 participant REC € 0 € 534,511 € 0
Israel SCANMASTER SYSTEMS (IRT) Ltd. (986275437) nan participant PRC € 0 € 89,133 € 0
Italy POLITECNICO DI TORINO (999977754) IT00518460019 participant HES € 0 € 112,166 € 0
Italy UNIVERSITA DEGLI STUDI DELLA CAMPANIA LUIGI VANVITELLI (999848356) IT02044190615 participant HES € 0 € 103,296 € 0
Bulgaria OPTIM-AL EOOD (986523563) nan participant PRC € 0 € 133,888 € 0
Germany SIEMENS AKTIENGESELLSCHAFT (999987260) DE129274202 participant PRC € 0 € 314,315 € 0
Italy DMA SRL (996258095) IT07376180019 participant PRC € 0 € 191,589 € 0
Italy Tecnomatica s.a.s. di Giuseppe Porcaro & C (986311618) nan participant PRC € 0 € 172,004 € 0
Spain UNIVERSIDAD DE SEVILLA (999862518) ESQ4118001I participant HES € 0 € 272,272 € 0