RCMS (636158)

  https://cordis.europa.eu/project/id/636158

  Horizon 2020 (2014-2020)

  Rethinking Container Management Systems

  Next generation transport infrastructure: resource efficient, smarter and safer (MG-8.2a-2014)

  automation  ·  air pollution engineering  ·  pollution  ·  robotics  ·  simulation software

  2015-05-01 Start Date (YY-MM-DD)

  2017-01-31 End Date (YY-MM-DD)

  € 4,182,954 Total Cost


  Description

Container terminals serve thousands of ships, store billions of TEUs, compete to serve the next vessel, and introduction of larger ships will result in new challenges. While advances have been made in terminal automation (Automated Ground Vehicle (AGV), gate control, yard cranes, etc.), with current technologies terminals are limited by their ability to maintain growth and quality of service. To address these trends and demands the Robotic Container Management System (RCMS) has been developed. As a contribution to its implementation, Project main objectives are: A. to develop a detailed simulation model for RCMS to be evaluated in 2 Terminals (Gdansk and Koper) plus a set of generic simulation tools to be used in all terminals; B. to assess and compare RCMS performance with other state-of-the-art container handling technologies for 2 Terminals (Gdansk and Koper) with different features; C. to assess and compare RCMS performance with other state-of-the-art container handling technologies for 2 ports (Gdansk and Koper), with focus on comparison between RCMS solution and port surface extension; D. to assess impact of RCMS in a simulated transport network in terms of efficiency, reliability, capacity, performance indicators (travel times, average speed, etc.) and impacts (noise and air pollution) in the Port of La Spezia. Main results will be: a well-defined RCMS control logic; a dynamic physical AGV model to test AGV behavior; definition of operational procedures for RCMS; a generic simulation tool enabling testing of RCMS for various sites by non-simulation experts; an efficient entire terminal design with RCMS; a set of validated and quantified benefits of RCMS compared to commonly used handling systems; a set of Key Performances Indicators of the transport network using RCMS. Consortium is made by leading industries, SMEs, Research/Academic Centers and 3 ports/terminals as End-users. Project duration is 21 months and estimated eligible costs are 4 million €


  Complicit Organisations

1 Israeli organisation participates in RCMS.

Country Organisation (ID) VAT Number Role Activity Type Total Cost EC Contribution Net EC Contribution
Israel ISRAEL AEROSPACE INDUSTRIES LTD. (999969315) IL520027194 participant PRC € 1,778,609 € 1,778,609 € 1,778,609
Poland GDANSKI TERMINAL KONTENEROWY SPOLKA AKCYJNA (937093915) PL5832555159 participant PRC € 93,187 € 93,187 € 93,187
Spain COMPASS INGENIERIA Y SISTEMAS SA (938166832) ESA62485180 participant PRC € 128,062 € 128,062 € 128,062
Germany SELLHORN INGENIEURGESELLSCHAFT MBH (972190455) DE118573659 participant PRC € 376,950 € 376,950 € 376,950
Slovenia LUKA KOPER, PORT AND LOGISTIC SYSTEM, D.D. (999770368) nan participant PRC € 112,870 € 112,870 € 112,870
Italy CIRCLE SPA (946059916) IT07869320965 coordinator PRC € 431,073 € 431,073 € 431,073
Spain CENTRE INTERNACIONAL DE METODES NUMERICS EN ENGINYERIA (999658721) ESQ5850006G participant REC € 104,625 € 104,625 € 104,625
Italy UNIVERSITA DEGLI STUDI DI GENOVA (999976687) IT00754150100 participant HES € 446,651 € 446,651 € 446,651
Germany HHLA INTERNATIONAL GMBH (943684774) DE811135888 participant PRC € 649,611 € 649,611 € 649,611
Italy AUTORITA DI SISTEMA PORTUALE DEL MAR LIGURE ORIENTALE (912347081) IT01447450113 participant PUB € 61,312 € 61,312 € 61,312